VANTAGE - Teluk Panglima Garang



 

 

SCOPE OF WORKS:-

  • Rigging studies with Autocad drawings.
  • Supply of:
    • One (1) unit 350 tonnes Crawler Crane (Manitowoc 4600S4).
    • One (1) unit 150 tonnes Truck Crane (P&H9170TC).
  • Supply of manpower, rigging supervisor and riggers to assist and supervise of the lifting operations.
  • Supply of necessary lifting appliances.

 

DESCRIPTION.

The 100 tonnes cutter ladder of the dredging barge was lifted by one (1) unit 350 tonnes Crawler Crane and one (1) unit 300 tonnes Truck Crane and to install and connect by pin on to the barge at Telok Panglima Garang.

 