SEWAGE TREATMENT PLANT PROJECT
We
have secured a heavy lifting job to supply one (1) unit Prime Mover complete with
Multi-axle trailer, two (2) units 300 Tons Truck Crane to off load two (2) units
of Tunnel Boring Machine from the vessel at West Port and provide transportation
of the Tunnel Boring Machines to the jobsite at Jalan Pantai Dalam & Brickfields.
Upon arrival at the jobsite, these two TBM is lifted by two (2) units 300 Tons
Truck Crane from the Multi-axle trailers and lowering into the pit hole which
our job include the supervision and final alignment on to the track. Rigging studies
with supporting drawings are prepared and issued by us in order to analyze and
plan the lifting procedures before commencing the project.
 |
| Lifting TBM from the vessel at West
Port
|
|