| Titan Aromatic Plant Precision
planning is crucial for every lifting of heavy equipment. To achieve this precision,
each lifting procedure will be studied, simulated and converted into technical
drawings using our company’s computerized system before the commencement
of the lifting.
 |
| Manitowoc 4100 Series
3 Ringer | In the Titan Aromatic Plant Project
at Pasir Gudang, Johore, the lifting of five units of Towers and Columns up to
83 Ton was simulated with technical drawings before we supplied one (1) unit of
Manitowoc 4100 Series 1 Crawler Crane c/w Series 3 Ringer Attachment with 300
Ton lifting capacity, one (1) unit of 100 Ton Kobelco P&H 5100 Crawler Crane
including the supply of under-hook appliances and our highly experienced manpower
to supervise and carry out the heavy lifts in a challenging site condition. In addition, we provided transportation for the mobilization
and demobilization, manpower for the assembly and dismantling of cranes. |